A commercial resurfacing project is a shutdown project. The finish matters, but so do access, code compliance, guest communication and the conditions for reopening. Use this checklist to plan the construction side; the commercial service page covers the work itself, and the board and hotel planning guide covers approvals and funding.
Build the shutdown plan
- Set the closure window and identify who can approve a schedule change.
- Decide how the pool area will be secured: fencing, locked gates, signage and a route that keeps guests and residents away from the work zone.
- Identify delivery, parking and equipment staging areas, including any loading-dock or elevator restrictions.
- Confirm water, power and restroom access for the crew without creating a guest-safety conflict.
- Plan for noise, dust and debris, and tell adjacent tenants or departments what to expect.
For a hotel or shared property, the closure plan should also identify alternate amenities and who will update guests or residents. A sign on the gate is not a communication plan.
Confirm the plan-review track before bidding
Colorado’s 5 CCR 1003-5 section 1.4 distinguishes:
- Semi-public pools: Hotels, motels, country clubs, health clubs and mobile home parks.
- Private pools: Pools serving single-family homes, condominiums or apartments, used solely by residents and their guests. These are exempt from this rule.
Confirm classification with the local health agency. For work subject to Article II, the rule requires:
- Plans and specifications submitted at least 30 days before construction or remodeling.
- Notice at the start and completion of work to permit inspection.
- Written certification that the facility was built as approved.
- Approval before use, with required facilities installed and operable.
The CDPHE pool program notes that local programs may use the MAHC or local construction standards. Ask who reviews and inspects this project.
Put that responsibility in the contract and the schedule. A plan-review delay is not a contractor workmanship problem, but it can move the reopening date.
Assemble the contractor packet
Ask for a written scope, schedule, insurance certificate, safety plan, communication contact and warranty terms. For a public or commercial pool, confirm who is responsible for permits or inspections if the local jurisdiction requires them. Do not assume a residential bid format covers a commercial property’s requirements.
The contractor should explain how additional repairs will be documented and approved, and who can authorize a change when the property contact is unavailable. Put that authority in writing.
Keep the barrier under control during work
An empty pool is still an accessible excavation. Decide who locks gates and how deliveries pass without leaving access open. Where 5 CCR 1003-5 section 3.24 applies, it specifies:
- A barrier at least 60 inches high.
- Self-closing, self-latching gates, with latches at least 54 inches high.
- More stringent local building codes or ordinances take precedence.
Confirm applicable controls with the local agency. The closure plan should identify who maintains them each day, not just at handoff.
Communicate with guests and residents
Prepare a short notice that explains the closure window, the reason for the work, the alternate facility if any, and how updates will be shared. Avoid promising a reopening date before the contractor confirms the schedule. Include a contact for questions and a process for reporting a safety concern.
Plan the handoff
Collect the inspection or approval record, product record, care instructions, warranty terms, startup responsibilities and any outstanding items. Confirm who tests and adjusts water, who brushes or monitors the finish, and what restrictions remain after refill. Assign those tasks to a named role, not “the pool company,” and include the backup.
Keep the approved scope, change approvals, photos and care records together. If the property changes managers, the next person should be able to see what was installed, what was inspected and what remains open. For the construction sequence, see the process guide; to start a written estimate, use the quote form.