Your role in a resurfacing project is to keep access predictable, make decisions when needed and arrange the agreed handoff care. You do not need to drain the pool, prepare chemicals or supervise application. The main process guide covers the construction stages; this checklist covers the owner’s side.
Before a start date is confirmed
Walk the proposed route from the street to the pool with the contractor. Identify gates, stairs, narrow turns, overhead obstructions and areas that need protection. Ask where equipment, materials and debris will go, and whether parking or access permissions are needed.
Point out irrigation, buried utilities you know about, recent landscaping and fragile deck areas. Do not guess at underground locations. Ask what locating or other site checks are required before any affected work.
Confirm water and power needs, working hours and who is allowed onto the property. Avoid putting gate codes in public-facing project notices. If you want to talk through access or timing before a site visit, the site offers a 30-minute phone consultation; it is a phone call, not an on-site inspection, and any site assessment is arranged separately.
Plan for an empty shell
Ask the contractor how the pool will be drained, how groundwater conditions will be checked and where the discharge will go. In the Denver area, recent snowmelt, heavy rain or a high water table can change the answer. An in-ground shell is held down by the weight of its water; Pentair’s drain installation guidance describes groundwater creating hydrostatic uplift and a relief valve’s role in relieving it. That is why draining is a planned operation, not a household chore.
Do not open a hydrostatic valve, remove a drain cover or start pumping to “get ahead.” A drained pool also creates a fall and construction-access hazard. Keep the empty shell inside the contractor’s controlled work zone and confirm who is responsible for checking the barrier at the end of each day.
Set up the household for a work zone
- Move furniture, toys and removable items from the agreed area.
- Keep pets and children away from the work route and empty pool.
- Decide who locks gates at the end of each workday.
- Tell the contractor about deliveries or other trades sharing the access route.
- Give one reachable approval contact and a backup for unexpected conditions.
Do not leave a pool gate propped open for convenience. A construction barrier is a control, not supervision: it keeps people out of the work zone, but someone still has to check it and account for children and pets. Put that check in the daily routine rather than assuming the crew will notice.
Agree on decisions before the pool is empty
Confirm the exact finish and any tile work in writing. Ask how additional repair findings will be photographed, priced and approved. Identify the latest point at which a product selection can change without altering the schedule or cost.
Keep planned gatherings flexible until the actual scope and weather-dependent work window are understood. Use the finish selection checklist to record the exact product before approving it.
Arrange refill and startup coverage
Ask who starts and monitors filling, what to do if the water stops and whom to contact outside working hours. Do not apply an online fill or chemistry recipe to an unidentified finish.
PebbleTec’s startup instructions, for example, require uninterrupted filling and subsequent brushing and testing. The selected manufacturer’s instructions should determine your actual schedule. Arrange a responsible person or service company if you will be away.
Complete a handoff walkthrough
Collect the product record, care instructions, warranty terms, service responsibilities and any unresolved items. Ask for explicit guidance on swimming, heating and cleaner use; a full pool is not by itself a release for every activity.
Keep dated photos and water-care records together. If something looks unexpected, report it rather than scraping, draining or adding corrective chemicals on your own. An agreed contact and written care plan are more useful than trying to memorize the entire construction process.