Two resurfacing bids are comparable only when they describe the same work. Before comparing totals, separate the base finish installation from allowances, optional upgrades and work that is excluded. Use the pricing guide for external cost context, not a company price offer or local market survey. Use this checklist to understand what a particular proposal actually buys.
Build a one-page scope comparison
Copy these headings into a document and put each contractor’s answer beside them:
- Pool included: dimensions, depth range, attached spa, steps and benches. Ask whether the measured area is the interior surface or just the water’s footprint.
- Preparation: which existing coatings or loose materials will be removed, what remains, and how the proposed finish system will be prepared.
- Repairs: locations already identified, repair method proposed and any conditions that require a separate investigation.
- Finish: manufacturer, product line, color and included application work. “Premium pebble” is not a complete product specification.
- Adjacent work: tile, coping, fittings, markers and deck protection. Separate replacement from protection of existing items.
- Handoff: filling, startup visits, testing, brushing and equipment restrictions, with a named responsible party for each.
An unanswered line is a question, not proof that the contractor omitted the work. Ask for a written clarification before treating one price as better value.
Price the regulatory and fill items
First confirm the pool’s classification and local review program. 5 CCR 1003-5 section 1.4 exempts private pools used solely by residents and their guests. Hotels and other defined semi-public pools are covered. For work subject to Article II, account for:
- Plans and specifications submitted at least 30 days before construction or remodeling.
- Notice at the start and completion of work to permit inspection.
- Written certification that the facility was built as approved.
- Approval before use, with required facilities installed and operable.
The CDPHE pool program explains that local programs may use the MAHC or local construction standards. Confirm the project’s requirements with the local health agency. Give plan preparation, engineering, permits and inspection attendance separate scope lines, with a responsible party for each.
Keep fill-water protection and testing separate:
- Pool fill: Where the rule applies, section 3.15 requires an accepted reduced-pressure backflow preventer or the specified air gap for potable make-up water.
- Denver Water assemblies: Its Cross-Connection Control program requires testing on installation and annually thereafter by a certified tester. Residential assembly requirements depend on site hazards.
- Project responsibility: Ask which connections and assemblies exist, where test records are kept, and what work is included or excluded. For another water supplier, confirm its requirements.
Section 3.15’s annual-test sentence follows its chemical-feeder and water-fed-chlorinator provision; it is not the basis for a blanket make-up-water testing claim. These are scope questions, not a reason to invent a line-item price.
Understand allowances and hidden-condition work
An allowance is an amount reserved for work that is not fully defined. Ask what quantity it covers, what happens if it is unused and how additional work is priced. A unit price is useful only when its unit is clear: per repair, per area or per length are different commitments.
For example, a proposal might include removal of visibly loose material but leave the extent of additional removal subject to inspection. Ask who documents that condition, when you receive photos and whether work pauses until you approve a change. Do not assume that a verbal contingency ceiling is part of the contract.
Record the approval contact and an alternate. Being unavailable when a concealed condition is found can delay a decision; it should not silently authorize unlimited extra work.
Check exclusions without adding imaginary prices
Ask who pays for the refill water and whether the meter or rate changes the cost. Ask where discharge water will go and who obtains any required permission. Include access protection, debris removal, equipment repairs and restoration outside the work area. Some items may be included, some excluded and some unnecessary for your pool; do not add a generic online allowance and call the result a quote.
Startup deserves particular attention. PebbleTec’s manufacturer procedure recommends testing source water before filling and describes continuous filling, brushing and water-care requirements for its finishes. That is evidence that handoff involves actual tasks, not evidence that a particular bidder includes them. Other products require their own instructions.
Compare the contract, not just the total
Check payment milestones, weather-related schedule changes, written warranty coverage and exclusions, and the process for reporting a concern. A lower total is not automatically defective, and a higher one is not proof of better workmanship.
Keep the accepted scope, product selection and approved changes together. The useful outcome is a documented agreement you can check at handoff, not a prediction based on price alone. For the work sequence behind those line items, see the resurfacing process.