A useful estimate starts with observations, not a homeowner diagnosis. Gather a small set of clear photos, known history and practical constraints. That helps a contractor prepare questions and identify what still requires an inspection; it does not turn a photo submission into a final repair scope. The quote form accepts optional photos, and the phone consultation is a 30-minute call, not a site visit.
Take a small, purposeful photo set
Start with an overview showing the pool shape, then photograph the issue from a safe standing position. Include a wider view to locate each closeup: a crack photo without context may not show whether it is on a step, wall or deck.
- Photograph visible roughness, stains or flaking in good light.
- Include steps, benches, waterline tile and coping where relevant.
- Show the route from the gate to the pool if access is restricted.
- Label the photos with simple locations such as “shallow steps” or “north tile line.”
Stay on the deck. A loose, broken or missing drain cover is a suction-entrapment risk while the pump is running, so do not enter the water to photograph or probe it. An empty pool adds fall and construction hazards of its own. Do not remove fittings or climb on equipment for a better image.
Use the plaster observation log to record texture and stain changes. For movement or recurring water loss, keep the shell-versus-surface questions separate from finish selection.
Describe the fill and discharge setup
Ask where the pool is filled from, whether that tap passes through a water softener, and where draining or discharge water would go. Denver Water’s hardness page explains that supply varies by collection system and season, so a citywide hardness number is not your pool’s test result. Add the actual provider and any recent fill-water test to the packet.
Include fill-connection records, not a plumbing diagnosis:
- Regulated public or semi-public pool: Where the rule applies, 5 CCR 1003-5 section 3.15 requires an accepted reduced-pressure backflow preventer or the specified air gap for potable make-up water.
- Denver Water customer: Its Cross-Connection Control program requires assembly testing on installation and annually thereafter by a certified tester. Residential assembly requirements depend on site hazards.
- Private pool or another supplier: Confirm applicable connection and testing requirements with the water supplier. Identify who maintains the connection and attach any test record.
Private pools are exempt from the state pool rule; local and water-supplier requirements still need checking. The rule’s annual-test sentence follows its chemical-feeder provision, not the make-up-water paragraph. These records help scope the estimate; they are not instructions for changing plumbing.
Separate facts from estimates
Write down dimensions and depths if you know them, but label approximate figures. Record the last resurfacing date, finish name, repairs and water-loss investigations only when supported by records or your own knowledge.
“Purchased the home in 2022; previous finish date unknown” is more useful than an invented age. If you have an old invoice, remove payment details or unrelated personal information before sharing it.
Add a short symptom history: when you first noticed the issue, whether it has changed, where it appears and what cleaning or treatment has already been attempted. Attach recent water-test records if available; do not change the water chemistry merely to improve the photos.
Describe access and project constraints
List gates, steps, parking restrictions, shared access and pets. For a managed property, identify the person authorized to approve work and any vendor-onboarding requirements. State your preferred opening date as a goal, not a presumed construction commitment.
Mention other planned work, including tile, coping or equipment changes. Ask whether those trades need coordination before finish installation. The owner preparation checklist covers arrangements once a project moves forward.
Bring three unanswered questions
Ask what the photographs cannot establish, what inspection is needed and how additional findings would affect the written scope. Do not drain the pool or chip the surface in preparation for an estimate.
Choose how to start
The quote form asks for contact details, the pool’s ZIP or city and what you are seeing, and it accepts up to five optional photos of 5 MB each and 20 MB total. Photos are optional; the form still works without them. If you would rather talk first, book a 30-minute phone consultation and choose a Mountain Time slot. That call is about your pool and next steps; it is not an on-site inspection.
Keep your original notes so you can compare the eventual proposal against the same observations. Then use the bid checklist to distinguish included work from allowances and exclusions.
Ready to talk through your pool? Book a 30-minute phone consultation first, or request a free estimate with photos.
